Direct answer

A freight order in SAP Transportation Management is a capacity and execution planning document, commonly for road or rail movement. It can group one or more freight units, specify transport stages, route, vehicle or carrier information, planned pickup and delivery dates, and relevant execution data. It is distinct from the underlying freight demand and from proof that the shipment physically moved.

Transportation planner reviews the truck, planned stops and carrier capacity with a dispatcher.
Transportation planner reviews the truck, planned stops and carrier capacity with a dispatcher.

Freight unit versus freight order

A freight unit represents a transport demand which must be planned. A freight order represents the capacity and itinerary used to move that demand. A freight order may contain compatible units from multiple originating orders or deliveries, provided consolidation, loading, temperature and time constraints permit.

SAP TM can create freight orders manually or through supported optimization and scheduling scenarios. Freight order types and deployment configuration determine available processing behavior.

Worked example: two deliveries on a road route

A supplier has a 10-pallet delivery to a regional distribution center and a 6-pallet delivery to another site along the route. The planner may assign both freight units to one suitable vehicle's freight order if loading, axle or space capacity, delivery windows and route constraints allow it.

The document can identify stops, planned dates and the responsible carrier. Neither an assigned carrier nor a confirmed plan proves loading or goods issue: warehouse and transportation teams must capture and reconcile actual events separately.

An end-to-end freight order timeline connecting demand, planning, actual movement and closure.
An end-to-end freight order timeline connecting demand, planning, actual movement and closure.

Who owns which decision?

The transport planner checks route feasibility, vehicle fit, stop sequence and delivery commitments. The purchasing or carrier-management team may govern subcontracting and freight agreements. Warehouse operations confirm physical loading and delivery documents; transport operations monitor carrier acceptance, departure, arrival and exceptions.

When plans change—for example a missed pickup or an unavailable truck—consultants should test how users replan the freight order without destroying source-document traceability.

Freight execution and financial control

Freight orders can support charge calculation, carrier selection, subcontracting and settlement depending on the implemented process. A freight cost estimate is not a final carrier invoice or proof of performance.

Consultants review planned versus actual milestones, discrepancies, costs and linked deliveries; confirm that downstream documents represent the event they claim to record.

Practical review checklist

  • Check freight-unit assignment and constraints.
  • Validate stops, vehicle capacity and delivery time windows.
  • Identify responsible carrier and actual execution milestones.
  • Reconcile delivered quantities, exceptions and transport charges.